Pub On Pima

This basement finish was in a townhouse originally built in 1980, and the basement was never improved. An egress window was required for permitting and safety purposes, and was installed. The project began in late August 2013, and on September 12, 2013, Boulder, Colorado experienced unprecedented rainfall which ultimately flooded the entire basement with over seven feet of muddy storm water. After restoration of what remained in the basement the project was completed. The Pub On Pima features a beetle-kill pine bar top, dimmable LED ceiling fixtures, dual flush toilet, a cellar/storage room, wired surround speaker, and a dual tap kegerator.

Pub on Pima bar
 Pub on Pima hall  Pub on Pima postersr  Pub on Pima bath